Esoteric DV-30s Service Manual Page 36

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 35
36 REPLACEMENT OF PARTS Manual No. 405/0101
REPLACEMENT OF PARTS - PAGE 36
9.16 TO REPLACE THE GAS VALVE SOLENOIDS
Refer to Fig. 40.
1. Gain general access as described in section 9.1,
paragraph 1.
2. Disconnect the gas valve electrical plug from the valve.
3. Remove the screw securing the solenoids mounting
bracket and carefully withdraw the mounting bracket,
complete with solenoids, from the valve.
4. Position the new solenoids in the mounting bracket, see
Fig. 40 and replace the mounting bracket.
5. Reconnect the plug to the gas valve and reassemble the
boiler as described in section 9.2, paragraphs 7 to 9.
6. Refer to the Lighting Instructions, section 8 and light the
boiler.
Fig.40
9.17 TO REPLACE THE IGNITION CIRCUIT BOARD
Refer to Fig. 41.
1. Gain general access as described in section 9.1,
paragraph 1.
2. Remove the four screws securing the control box front
cover and carefully swing down the cover.
3. Disconnect the three wiring connectors and the electrode
lead from the circuit board, see Fig. 41.
4. Carefully remove the circuit board from the mounting
pillars and replace with a new one.
5. Replace the wiring connectors and the electrode lead.
6. Replace the control box front, ensuring that the boiler
thermostat capillary is located in the cut out in the side of
the control box and secure it in position with the four
screws previously removed.
7. Reassemble the boiler as described in section 9.2,
paragraphs 6 to 9.
8. Refer to the Lighting Instructions, section 8 and light the
boiler.
Fig.41
9.18 TO REPLACE THE PUMP
1. Gain general access as described in section 9.1, paragraph 1.
2. Remove the screw securing the control box, see Fig. 25 and lower the control box.
3. Close the two pump isolating valves (closed when the operating spindles are vertical).
4. Place a cloth under the pump as it will contain a small amount of water when removed.
5. Loosen the two pump unions (immediately either side of the pump), taking care not to twist the pipework. Support the
pump and remove the two pump unions. Withdraw the pump to provide access to the two wiring cover screws, remove
the screws and cover then disconnect the wires.
6. Note which way the pump motor is fitted to the body - the replacement pump motor may have to be removed and
rotated to match the old one.
The arrow on the pump body, indicating the direction of flow must be pointing from left to right.
7. Connect the wires to the new pump - Brown to L, Blue to N and Green/Yellow to then replace the pump using two new
sealing washers.
8. Open the pump isolating valves. Vent the pump as described in section 3.16, paragraph 4 and check the pump
connections for water soundness.
9. Reassemble the boiler as described in section 9.2, paragraphs 5 to 9.
10. Refer to the Lighting Instructions, section 8 and light the boiler.
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 45 46

Comments to this Manuals

No comments